Cim360.cloud launches in March 2027 with the Core plan. Advanced and Complete follow in Q2 2027. See plans
Start free trialComing March 2027

Bills of materials

Multi-level bills of materials, costed and controlled

Define what goes into every product, build it from stock and know what it costs to make.

Cim360.cloud running on a desktop monitor, a rugged shop-floor tablet, a phone and a smartwatch on a workshop bench.

Structure

Multi-level BOMs with routings

Describe assemblies with their components, quantities, units of measure and scrap allowances, and add the operations that make them.

  • Multi-level assemblies for make-to-stock and make-to-order products
  • In-house and subcontract operations with labour and machine time
  • Drawings and documents attached to a BOM, available at the works order
  • Alternate component lists and routes for flexible sourcing

Kitting and assembly

Build from stock, or take it apart again

Issue and return materials against the BOM, and check whether you can build before you commit.

  • Kit build, issuing or returning materials from stock
  • Reverse build, to disassemble and recover components
  • Maximum build calculation from current stock availability
  • Trial kitting against current and future stock commitments
A Cim360.cloud stock level on a smartwatch and the inventory list on a phone, held in a factory.

Costing

Know what each product costs to make

Roll up the cost of every BOM and keep the history, so margins and cost changes can be reviewed with confidence.

  • Cost roll-up broken down by materials, labour and overhead
  • Costing history with date-stamped breakdowns
  • Optional version and revision control, with effective dates
  • Carbon cost (KgCO₂e) calculated for a BOM from its components

Engineer to order

A bespoke BOM for a single order

Build a custom bill of materials straight onto a quotation or sales order line, costed before you commit, then convert it to a works order (works orders are on Advanced and Complete, from Q2 2027).

  • Explosion to see every component, and implosion to see where a part is used
  • Custom BOMs linked to a quote or sales order
  • Margin-controlled quoting for custom-built products

Which plan includes it: Bills of materials, kitting and assembly are on every plan: Core, Advanced and Complete.

FAQs

Questions about bills of materials

Can't see your question?

Can a bill of materials have several levels?

Yes. Define multi-level assemblies with components, quantities, units of measure, scrap allowances and notes.

Can I build a one-off product for a single order?

Yes. Create a custom bill of materials linked to a quotation or sales order line and cost it. Converting it to a works order is available with Advanced and Complete, from Q2 2027.

Can I see what a product costs to make?

Yes. The cost roll-up shows the total build cost broken down by materials, labour and overhead, and the costing history is kept.

See it working with your own products

Start a free trial, or book a walkthrough with our team.

Start free trialComing March 2027

or anything first

  • 30-day free trial
  • Sample data to explore with
  • A UK team behind you